- EMS ÀÏ˾»ú¸£ÀûÉç Bond Progress
- Bryson Elementary School
Bryson Elementary School
-
Renovations are underway at
August 2019 Update:
- New front stone and brick entrance.
- New stone in the back of the gym.
- Finishing touches are underway in the gym.
- New tile and serving line with new cafeteria tables. New flooring is being installed on the hallway leading into the gym.
- New fencing and well house structure.
- New dumpster enclosure.
- New outside basketball court and playground with covers.
July 2019 Update:
- New moisture barrier installed on exterior and areas prepped for stone.
- Tile installed in the new kitchen serving line.
- New hallway added to gym entrance.
- Tiling is underway in the gym and iron work is being installed.
May 2019 Update:
- West side of gym wall has been demolished.
- Well house has been demolished.
-
September 2019 Construction Photos
-
August 2019 Construction Photos
-
July 2019 Construction Photos
-
May 2019 Construction Photos